Inspection History Details
Inspection Status: Correction Required
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/1999 | PLUMBING - FINAL | Correction Required | ADDTL COMMS - 1. (5) FIVE ANTI-SIPHON DEVICES INSTALLED. 2. ELECT GND COND INTO CONCRETE FLOOR UNDER PANEL. |