Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/08/2001 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection 0000*I AM ADVISED BY THE G.C THAT PLANS W/AS BUILT CHANGES ARE BEING PREPARED FOR SUBMITTAL WITHIN NOT MORE THAN 15 DAYS. |
| 07/31/2001 |
ELECTRIC - FINAL |
|
Denied |
IVRS - Inspection 0999*1.) PLACE PERMANENT LABELS ON ALL PANELS, LOAD CENTERS, DISCONNECTS, TIME SWITCHES, ETC. DO NOT USE MAGIC MARKER ON EXTERIOR SURFACES. 2.) INSTALL EXTENSION BOXES AT ALL LOCATIONS WHERE THE CONDUIT HAS BEEN TERMINATED ON THE BOX FACE PLATE. TERMINATIONS MUST BE READILY ACCESSIBLE 3.) INSTALL ACCURATE INDEXES IN ALL LOAD CENTERS. 4.) INSTALL FLAT FRESNEL LENS W/GASKET OVER SHOWER STALLS.5.) REVISE YOUR PLANS TO REFLECT ALL "AS BUILT" CHANGES. SUBMIT TO CITY DSC PLAN REVIEW FOR APPROVAL. |
| 07/11/2001 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000* |