Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date |
Description |
Inspector |
Results |
Comments |
| 01/10/2001 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Approved |
IVRS - Inspection 0000* |
| 05/16/2000 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
IVRS - Inspection 0000*/ALL PATIO COLUMN FOOTER AROUND HOUSE APPROVED. WE ARE MISSING ONE AT N/W CORNER OF GARAGE--HECTOR WILL HANDLE THIS. |
| 03/28/2000 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
ADDTL COMMS - PARTIAL - 1. THIS IS FOR YELLOW HIGHLIGHTED UPPER LEVEL FOOTINGS SIGNED AT BOTH ENDS. 2. OKAY TO POUR FOOTINGS IN #1 ABOVE AREAS. |
| 03/28/2000 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
IVRS - Inspection 0000* |
| 03/10/2000 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
ADDTL COMMS - PARTIAL - GARAGE PARIMETER FOOTING IS OKAY TO POUR. SEE HIGHLIGHTED FOUNDATION. (MAGENTA) NOTE: GARAGE INTERIOR FOUNDATION FOR RETAINER TO SECOND FLOOR AS BUILT: 24 WIDE WITH 2-#4 HORIZONTALS AND #5 AT 16 O.C. AS PER FIELD DISCUSISON WITH ARCHITECT, TIM ROBERTSON. |
| 03/10/2000 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
IVRS - Inspection 0000* |
| 03/08/2000 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
ADDTL COMMS - NOT READY - RETAINING WALL FOOTING DETAIL 1 ON S1.1 IS NOT PER PLAN. SEE TIM FOR CORRECTIONS. |
| 03/08/2000 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Not ready for Inspection |
NOT READY FOR INSPECTION |
| 03/07/2000 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
ADDTL COMMS - DENIED - 1. NO PLANS OR PERMITS. NEED PLANS TO CHECK REBAR PLACEMENT. SITE PLAN TO CHECK LAYOUT AND LOCATION. 2. CLEANOUT ALL FOUNDATIONS AND PROVIDE MINIMUM 3 UNDER #4 REBAR AND CLEAN SIDES OF FOUNDATIONS FROM MELT DOWN DUE TO RAIN FALL. |
| 03/07/2000 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
DENIED |