Permit: T99CM05002

Parcel: 14023086A

Inspection Status: Approved

Inspection History: MECHANICAL - FINAL

Date Description Inspector Results Comments
06/03/2010 MECHANICAL - FINAL Approved IVRS - Inspection :*
12/21/2009 MECHANICAL - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
12/18/2009 MECHANICAL - FINAL Cancelled
06/22/2009 MECHANICAL - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
12/26/2008 MECHANICAL - FINAL Not ready for Inspection IVRS - Inspection :*
12/22/2008 MECHANICAL - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. NEED MINIMUM 1/4" PITCH PER FT (H2O HEATER) FLUE
2. NEED SECONDARY DRAIN LINE OR ELECTRONIC SHUT OFF FOR CONDENSATE UNIT MOUNTED ABOVE FURNACE
3. VENT P-TRAPS CONDENSATE LINE (PRIMARY)
4. ADDRESS #
06/25/2008 MECHANICAL - FINAL Partial Approval IVRS - Inspection :*
1) FROM LAST INSPECTION #3 BELOW NOT DONE
2) REMOVE TAPE SINGLE TO DBL WALL FLUE
3) NEED CLEANOUT ON CONDENSATE LINE P-TRAP
01/16/2008 MECHANICAL - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) MOVE CONDENSATION LINE BY UNIT AS INDICATED
2) CONNECT WATER HEATER TO B-VENTS
3) REGISTER GRILLS MISSING THRU-OUT
08/31/2007 MECHANICAL - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) TRAP CONDENSATION LINE
2) PROTECT REF-LINES AND CONDENSATION LINES
3) 36" CLEARANCE REQUIRED IF FRONT OR A/C DISCONNECT
4) CONDENSATION LINE SHALL TERMINATE 6" ABOVE GRADE
5) STOPPED INSPECTION
6) HAVE MECHANICAL CONTRACTOR RE-CHECK ALL WORK TO MEET CURRENT CODE