Inspection History Details
Inspection Status: Partial Approval
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/03/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* SOIL WATER TEST OK P.O.C. OF NEW BLDG SEWER TO EXSISTING BLDG SEWER OK THIS INSPECTION IS FOR BLDG DRAIN AND BLDG SEWER ONLY OK TO BACKFILL TRENCH |
|
| 12/27/2000 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection 0999* MUST PROVIDE WATER TEST ON WASTE ALL THE WAY TO HCS CONNECTION MUST USE DIRECTIONAL FITTINGS FOR 2 WAY C.O. MUST USE L SWEEP ON 4" ON VERTICAL TO HORIZONTAL DRAINAGE MUST SHADE 4" WASTE LINE, THERE CAN BE NO BRIDGING |