Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/31/2000 |
BUILDING - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 09/06/2000 |
BUILDING - FINAL |
|
Partial Approval |
1. CLEAN OUT FLUE PIPES AND PROVIDE SPARK ARRESTOR. 2. RAISE FURNACE FLUE PIPE 1'-0" ABOVE PARAPET. 3. GFCI AT ISLAND NOT WORKING. 4. PROVIDE 90 DEGREE TURN DOWNS AT VACCUM EXHAUSTS. 5. REVISE SEPTIC PLAN CALL OUT. OK TO MOVE IN. |
| 09/01/2000 |
BUILDING - FINAL |
|
Denied |
1. PROVIDE 3 SCREWS MINIMUM AT FURNACE/HOT WATER FLUE SINGLE LAYER PIPES ALL JOINTS. 2. SEAL PENETRATIONS TO CEILING/ATTIC AT PLENUM. 3. PREVIOUS INSPECTION RESULTS FROM 3/20/00 SEPTIC SYSTERM REVISED SITE PLAN NOT PROVIDED. 4. PROVIDE APPROVED REVISION FOR PLUMBING ROUGH INSPECTION. 5. ADDED SQUARE FOOTAGE FOR SINGLE GARAGE NOT PROVIDED. 6. PROVIDE ALL APPROVED DOCUMENTS LOTS OF INSPECTIONS NOT SIGNED OFF. SEE REGULAR INSPECTOR ON THESE ISSUES. IF INSPECTION IS CALLED IN PRIOR TO HOUSE BEING READY YOU MAY BE SUBJECT TO A RE-INSPECTION FEE. |