Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 01/21/2000 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - CORRECTIONS ARE OKAY. |
| 01/19/2000 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - 1. BOTTOM PLATE SPLICES REQUIRE ABS WITHIN 12 BOTH SIDE OF SPLICE. 2. RESULTS FROM PREVIOUS INSPECTIONS MUST BE ON SITE. 3. PROVIDE ENGINEER APPROVAL FOR DAMAGED GABLE END TRUSS. 4. PROVIDE GABLE END HINGE BRACING PER UBC. 5. HEADERS IN BEARING WALLS MUST BEAR ON TRIMMERS. 6. PROVIDE TRUSS CALCULATIONS AT ROOF NAIL INSPECTION. STOPPED INSPECTION. |
| 01/19/2000 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0140* |
| 01/13/2000 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - 1. BOTTOM PLATE SPLICES REQUIE ABS WITHIN 12 BOTH SIDES OF SPLICE. 2. RESULTS FROM PREVIOUS INSPECTIONS MUST BE ON SITE. 3. PROVIDE ENGINEER APPROVAL FOR DAMAGED GABLE END TRUSS. 4. PROVIDE GABLE END HINGE BRACING PER UBC. 5. HEADERS IN BEARING WALLS MUST BEAR ON TRIMMERS. 6. PROVIDE TRUSS CALCULATIONS AT ROOF NAIL INSPECTION. STOPPED INSPECTION. |
| 01/13/2000 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0999* |