Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not ready for Inspection
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 01/04/2000 |
EXT METAL CLIPS/EXT SHEATHING |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 12/29/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - SEE NOTES FROM 12-21-99 INSPECTION. REPAIR BOTTOM PLATE - WEST END GABLE WALL. STRAP ACROSS TOP PLATES - WEST END. STRAP CORNER - NORTHWEST. USE WASHERS LARGE ENOUGH TO KEEP TOP OF BOTTOM PLATE. REPAIR GABLE TRUSS BRACE-EAST SIDE. |
| 12/29/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0145* |
| 12/21/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - 1. THE GABLE TRUSSES MUST BE BLOCKED AND CLIPPED PER DETAIL 2 OF SHEET A8. 2. THE WIND STRAPS MUST HAVE 2 LBD NAILS AT EACH END. 3. RSP-4 CLIPS TO STUDS-MUST BE MATCHED TOP AND BOTTOM. DONT SKIP A STUD. 4. THE ANCHOR BOLT NUT AND WASHER MUST NOT SINK INTO THE 2X BOTTOM PLATE. USE LARGER OUTER DIAMETER WASHERS. 5. ANCHOR YOUR SHEARWALLS 3 PER SHEAR SCHEDULE. |
| 12/21/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0145* |