Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/12/1999 |
PLUMBING - ROUGH, SOIL |
|
Correction Required |
ADDTL COMMS - PROTECT ALL EXPOSED ABS UP TO 5 HIGH |
| 10/08/1999 |
PLUMBING - ROUGH, SOIL |
|
Correction Required |
ADDTL COMMS - THE DWV PIPE MUST BE PLACED UNDER A WATER (HEAD PRESSURE) TEST. RAISE ONE VENT STACK A MINIMUM OF 36 ABOVE FLOOR LEVEL, PLUG THE REST OF THE OPENINGS, AND FILL WITH WATER. RE-CALL WHEN READY. |
| 10/08/1999 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0330* |