Inspection Status: Correction Required
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 12/07/1999 |
PLUMBING - ROUGH, SOIL |
|
Correction Required |
ADDTL COMMS - 1. SOIL WATER TEST OK 2. WILL REQUIRE REVISED AND APPROVED PLAN BEFORE FINAL ON WASTE AND VENT SYSTEM 3. DO NOT COVER BLDG SEWER CONNECTION TO BLDG DRAIN INSIDE BLDG 4. OK TO BACKFILL TRENCH. |
| 12/07/1999 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000* |
| 12/04/1999 |
PLUMBING - ROUGH, SOIL |
|
Correction Required |
ADDTL COMMS - 1. ROUGH SOIL NOT TO PLAN 2. NO APPROVED DRAWING FOR WASTE AND VENT SYSTEM AT RESTROOMS. 3. DO NOT BACKFILL |
| 12/04/1999 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0000* |