Inspection Status: Correction Required
Inspection History: SHEET ROCK NAILING
| Date |
Description |
Inspector |
Results |
Comments |
| 12/14/1999 |
SHEET ROCK NAILING |
|
Correction Required |
ADDTL COMMS - PLAN CALLS FOR 2 LAYER 5/8 DRYWALL TYPEX IF CONTINUING TO USE 2 LAYER 1/2 INCH. GET PLAN REVISED TO SHOW CHANGE. |
| 12/13/1999 |
SHEET ROCK NAILING |
|
Correction Required |
ADDTL COMMS - 1. #4 CHEARWALL IN GARAGE REQUIRES BLOCKED EDGES OR 4 NAILING PATERN 2. 5/8 FIREROCK REQUIRES EDGE NAILING AT MECHANICAL PLATFORM 3. #5 SHEARWALL REQUIRES BLOCKING AND EDGE NAILING |
| 12/13/1999 |
SHEET ROCK NAILING |
|
Denied |
IVRS - Inspection 0999* |