Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/08/2012 | ROOF NAILING | Approved | IVRS - Inspection :* | |
| 03/06/2012 | ROOF NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SECURE 4 GANG BOXES 2) TERMINATE ALL ROMEX INTO APPROVED BOXES AND SECURE PER CODE 3) PROVIDE WATER TEST 4) NAIL PROTECT ALL PLUMBING AND ELECTRICAL WHERE REQUIRED 5) FIRE STOP ALL FURR OUTS 6) INSTAL SHOWER DIVERTER 7) STUDS AT ALL TOP PLATE JOINTS 8) MINIMUM 1/4" SHEATHING ALL BOXES 9) PROVIDE COMPLETE SET OF PLANS 10) STOPPED INSPECTION |