Inspection History Details
Inspection Status: Correction Required
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/20/1999 | PLUMBING - ROUGH, SOIL | Correction Required | ADDTL COMMS - NOTE: LAYOUT NOT PER PLAN PLOT REVISION 3O SIDE YARDS ARE AT SITE NOT 3.71 AS PER PLAN. |