Inspection History Details
Inspection Status: Correction Required
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/30/1999 | PLUMBING - ROUGH, SOIL | Correction Required | ADDTL COMMS - 1. ON SEWER YOU MUST HAVE A 2 WAY CLEAN OUT-NOT TS. 2. WATER-CANNOT USE PVC INSIDE-OR OUTSIDE ABOVE GROUND. |