Inspection Status: Correction Required
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/28/1999 |
BUILDING - FINAL |
|
Correction Required |
ADDTL COMMS - INSTALL SCREWS AT PLASTIC CONDUIT CLAMP WHERE NAILS ARE BENT OVER ABOVE SERVICE PANEL. |
| 10/15/1999 |
BUILDING - FINAL |
|
Correction Required |
ADDTL COMMS - 1. IDENTIFY NEUTRAL FEEDER WITH WHITE TAPE, BOTH ENDS SERVICE AND AT THE SUB-PANEL. 2. CONDUIT: A. WRONG GLUE USED ON PIPE, ONE JOINT HAS SEPARATED ON ROOF. B. CONDUIT TO BE SUPPORTED AT 6 O.C., ROOF, STRAP, OR CLAMP TO BLOCKS. BLOCKS SHOULD BE ATTACHED TO ROOF, MASTIC. C. ATTACH TO SOUTH WALL. 3. IN SERVICE PANEL, STRANDED NEUTRAL, TOO BE IN WG CONNECTION BY ITSELF, MOVE #4 CAN TO GROUND BUSS, ONE WIRE PER TERMINAL. 4. ISOLATE NEUTRAL/GROUND WIRES IN SUB-PANEL, INSTALL CORD. BUSS IF NEUTRAL BAN HAS A GROUND SCREW, REMOVE IT, IT IS TO BE ISOLATED (FLOATING) FROM METER CAN. ALL NEUTRALS TO ISOLATED BAR, ALL BARE, ON CORD. TO CORD BUSS. 5. COOLER NEEDS A MIDWEST, BOX FUSE, PROTECTED. |
| 10/15/1999 |
BUILDING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000* |