Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 03/09/2000 |
PLUMBING - INTERMEDIATE |
|
Correction Required |
ADDTL COMMS - 1. WASTE AND VENT SYSTEM OK 2. ALL CORRECTIONS HAVE BEEN MADE 3. OK TO DRYWALL |
| 03/07/2000 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection 0000* |
| 03/04/2000 |
PLUMBING - INTERMEDIATE |
|
Correction Required |
ADDTL COMMS - 1. DO WATER TEST ON WASTE AND VENT SYSTEM 2. DRINKING FOUNTAIN @ NORTH SIDE REVENT FITTING IS BACKWARDS. 3. ALL HORIZONTAL ABS VENTS MUST BE STRAPPED OR HUNG EVERY 4 4. 2 & 1 1/2 HORIZONTAL VENTS EXCEED MAXIMUM LENGTH FOR HORIZONTAL RVN |
| 03/04/2000 |
PLUMBING - INTERMEDIATE |
|
Denied |
IVRS - Inspection 0000* |