Permit: T99CM03808

Parcel: 13316030F

Inspection Status: Correction Required

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
12/02/1999 PLUMBING - ROUGH, SOIL Correction Required ADDTL COMMS - 1. SOIL WATER TEST OK 2. WILL REQUIRE REVISED AND APPROVED DRAWING ON WASTE IN RM #110 3. OK TO BACKFILL TRENCH.
11/15/1999 PLUMBING - ROUGH, SOIL Correction Required ADDTL COMMS - 1. SEE SECTION 313.3 UPC TRENCH MUST MAINTAIN AT LEAST 45 DEGRESS FROM BOTTOM OF FOOTER TO BOTTOM OF BLDG TRENCH 2. DO NOT BACKFILL TRENCH
11/15/1999 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0000*
11/10/1999 PLUMBING - ROUGH, SOIL Correction Required ADDTL COMMS - 1. SOIL WATER TEST OK 2. MOVE 4 VENT FOR TANK SEPERATOR WITHIN 10 OF OUTLET OF TANK 3. OK TO BACKFILL TRENCH
11/10/1999 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*
11/04/1999 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*
10/01/1999 PLUMBING - ROUGH, SOIL Correction Required ADDTL COMMS - 1. SOIL WATER TEST OK 2. WILL NEED REVISED AND APPROVED DRAWING ON BASEMENT SOIL AND VENT SYSTEM BEFORE FINAL 3.OK TO BACKFILL TRENCH
10/01/1999 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*
09/28/1999 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection 0000*
09/10/1999 PLUMBING - ROUGH, SOIL Correction Required ADDTL COMMS - 1. SOIL WATER TEST OK 2. WASTE LINE FOR DRYING CANOPY ONLY PLAN SHOWS 2 HOWEVER 4 IS OK 3. OK TO BACKFILL TRENCH
09/10/1999 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*
08/18/1999 PLUMBING - ROUGH, SOIL Correction Required ADDTL COMMS - 1. HCS SEWER TAP OK 2. SOIL WATER TEST OK 3. OK TO BACKFILL TRENCH
08/18/1999 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*
08/17/1999 PLUMBING - ROUGH, SOIL Correction Required ADDTL COMMS - 1. SOIL WATER TEST OK 2. OK TO BACKFILL
08/17/1999 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*