Inspection History Details
Inspection Status: Correction Required
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2000 | PLUMBING - ROUGH, SOIL | Correction Required | ADDTL COMMS - NEED AS BUILTS ON ---- LAYOUT AND SEWER. |