Inspection Status: Correction Required
Inspection History: ROOF NAILING
| Date |
Description |
Inspector |
Results |
Comments |
| 04/04/2000 |
ROOF NAILING |
|
Correction Required |
ADDTL COMMS - APPROVED - FRAME IS OKAY. PLUMBING IS NOT COMPLETE. OKAY TO DRYWALL ALL BUT THE NORTH WALL. |
| 03/16/2000 |
ROOF NAILING |
|
Correction Required |
ADDTL COMMS - DENIED - 1. NEED CITY OF TUCSON APPROVAL ON TRUSS DRAWINGS. 2. PROVIDE CITY OF TUCSON AND ENGINEER APPROVED REPAIR DETAIL FOR 5 DAMAGED AND REPAIRED TRUSSES. 3. LAYOUT OF WALLS AND ROOMS ARE NOT PER PLAN. YOU MUST BUILD TO PLAN OR REVISE PLAN TO AS BUILT. INADEQUATE NATURAL LIGHT IN MASTER BEDROOM. 4. PLAN CALLS FOR METAL DUCT WORK. FLEX DUCT USED. REVISE PLAN. 5. BLOCK DUCT DEFUSERS ON 3 SIDES. 6. PLUMBING IS NOT INSTALLED. 7. NAIL PROTECT ALL WIRES WITHIN 1-1/4 OF STUD SURFACE. 8. PROVIDE STUD FOR DAY WALL NAILING AT SOUTHWEST CORNER. 9. PROVIDE ATTIC ACCESS. 10.RAMADA IS NOT BUILT. |
| 03/16/2000 |
ROOF NAILING |
|
Denied |
DENIED |