Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 05/10/2002 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 11/22/2001 |
FRAMING |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) PARTIAL ON INTERMEDIATE GROUP PENDING ACCESS PANELS FOR STUD OR VENTS AND TUB GROUT |
| 11/19/2001 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) HOMEOWNER TOOK NOTES |
| 11/15/2001 |
FRAMING |
|
Denied |
1) NOT COMPLETE |
| 10/17/2001 |
FRAMING |
|
Denied |
IVRS - Inspection 0950*/ 1) PLUMBING VENT FOR BATHROOM CANNOT RUN HORIZONTAL UNTIL 42" ABOVE FLOOR-6" ABOVE FLOOD RIM 2) AIR ADMITANCE VALVE CANNOT BE ENCASED IN WALL 3) PEX PLUMBING CANNOT BE JOINED BY HOSE CLAMP 4) STUDS CANNOT EXCEED 24" ON CENTER 5) PLUMBING AND ELECTRIC NOT COMPLETE NOTE: BEARING WALL OK, CANNOT APPROVE UNTIL ALL TRADES COMPLETE |
| 10/12/2001 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 09/26/2001 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) PROVIDE A COMPLETE SET OF PLANS-PAGE A4 MISSING 2) METAL FRAME BEARING WALL MUST BE BUILT TO REQUIREMENTS OF " PRISCRIPTIVE STANDARDS FOR LIGHT WEIGH METAL FRAME CONSTRUCTION" OR THE INTERNATIONAL RESIDENTIAL BLDG CODE CHAPTER 6 3) ITEM 2, 3, 4, 5, 7, 8, 9 AND 10 FROM 9/18/01 OPEN |
| 09/18/2001 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) REMOVE ALL ELECTRIC SWITCHES AND OUTLETS FOR EXAMINATION OF ELECTRIC BOXES 2) MANY ELECTRIC OUTLETS NOT INSTALLED 3) PLUMBING NOT COMPLETE 4) DRYER MUST HAVE FOUR PRONG OUTLET 5) 14 GAUAGE WIRE NOT ALLOWED IN 20 AMP CIRCUIT 6) ELECTRIC SUB PANEL MUST HAVE AN ISOLATED NEUTRAL BAR 7) CONDUIT LOCK NUTS LOOSE, REQUIRE WASHER, FILL K.O.'S 8) DO NOT MIX WIRE SIZES IN SOME CIRCUITS 9) METAL FRAME BEARING WALL NOT BUILT PER CODE 10) BLOCK MECHANICAL DEFUSER COLLARS 3 SIDES |
| 07/05/2001 |
FRAMING |
|
Not ready for Inspection |
1) FRAMING WILL BE APPROVED WHEN ALL TRADES ARE COMPLETED |