Inspection Status: Correction Required
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/29/1999 |
BUILDING - FINAL |
|
Correction Required |
ADDTL COMMS - 1)FREEAE BOARD MISSING BY KITCHEN 2)A/C FLEX CONDUIT NOT SECURED WITHIN 12 OF DISCONNECT 3)HOLE IN WALL BY A/C CONDENSOR 4)OVERSIZE FUSES AND C/B FOR A/C MAX ALLOWED 30 AMP 4) NO PLANS OR PERMIT. HOUSE NOT READY; STOPPED INSP NEXT FAILURE WILL REFEE |
| 10/29/1999 |
BUILDING - FINAL |
|
Correction Required |
ADDTL COMMS - 1)FREEAE BOARD MISSING BY KITCHEN 2)A/C FLEX CONDUIT NOT SECURED WITHIN 12 OF DISCONNECT 3)HOLE IN WALL BY A/C CONDENSOR 4)OVERSIZE FUSES AND C/B FOR A/C MAX ALLOWED 30 AMP 4) NO PLANS OR PERMIT. HOUSE NOT READY; STOPPED INSP NEXT FAILURE WILL REFEE |
| 10/29/1999 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999* |
| 10/28/1999 |
BUILDING - FINAL |
|
Correction Required |
ADDTL COMMS - 1)ELECTRIC SERV REQ NON WTR BOND CABLE, 2)EXPOSED SUTCCO LATH BYKITCHEN AND BY A/C 3) HOUSE NOT COMPLETE & READY TO OCCUPY;STOPPED INSP |
| 10/28/1999 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0950* |
| 10/27/1999 |
BUILDING - FINAL |
|
Denied |
DENIED |