Inspection Status: Correction Required
Inspection History: SHEET ROCK NAILING
| Date |
Description |
Inspector |
Results |
Comments |
| 09/13/1999 |
SHEET ROCK NAILING |
|
Correction Required |
ADDTL COMMS - MARK EACH SITE WITH LOT NUMBERS OR STREET ADDRESS. THEY MUST BE IDENTIFIABLE FROM STREETSIDE. |
| 09/10/1999 |
SHEET ROCK NAILING |
|
Correction Required |
ADDTL COMMS - 1. TWO STUDS NOT NAILED IN MASTER BEDROOM #1 SHEAR WALL MUST BE NAILED TO STUDS SPACED 6 O.C. |
| 09/10/1999 |
SHEET ROCK NAILING |
|
Denied |
IVRS - Inspection 0935* |
| 09/09/1999 |
SHEET ROCK NAILING |
|
Correction Required |
ADDTL COMMS - 1. TWO STUDS ARE NOT NAILED IN THE MASTER BEDROOM. S/W/1. 2. 1 STUD NOT NAILED LIVING ROOM. S/W/1. 3. FIRE SEPARATION WALL NOT COMPLETE. |
| 09/09/1999 |
SHEET ROCK NAILING |
|
Denied |
IVRS - Inspection 0175* |