Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Correction Required
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/28/1999 |
PLUMBING - ROUGH, SOIL |
|
Correction Required |
ADDTL COMMS - 1. ALL CORRECTIONS HAVE BEEN MADE 2. OK TO VACKFILL TRENCHES |
| 07/26/1999 |
PLUMBING - ROUGH, SOIL |
|
Correction Required |
ADDTL COMMS - 1. CAN NOT USE NO HUB COUPLINGS ON PLASTIC. COUPLING MUST BE SPECIALTY COUPLINS WHEN YOU CONNECT ABS TO C.I. 2. OUTLET OF GREASE TRAP HAS OBSTRUCTION OF FLOW @ OUTLET OF TRAP. 3. N.H. COUPLINGS @ OUTSIDE OF BLDG, MUST ALSO BE SPECIALTY COUPLINGS 4. MUST PAY REINSPECTION FEE BEFORE NEXT INSPECTION |
| 07/26/1999 |
PLUMBING - ROUGH, SOIL |
|
Denied |
DENIED |
| 07/22/1999 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0000* |
| 07/19/1999 |
PLUMBING - ROUGH, SOIL |
|
Correction Required |
ADDTL COMMS - 1. CAN NOT USE FERMCO COUPLING UNDER SLAB 2. GREASE TRAP MUST HAVE EVEN FLOW @ OUTLET OF TRAP. GALV BUSHING MUST BE REMOVED DUE TO OBSTRUCTION OF FLOW. 3. GREASE TRAP MUST BE VENTED 4. 2 WASTE LINE MUST GO ALL THE WAY TO BAR SINK W/CO @ CHANGE OF DIRECTION 5. 3 COMPT BAR SINK MUST HAVE DRAINAGE FITTING AND STUDOR VENT W/TRAP AND C.O. 6. CAN NOT USE N.H. COUPLING TO CONNECT 2 WASTE LINE FROM B. SINK MUST BE SPECIALTY COUPLING |
| 07/19/1999 |
PLUMBING - ROUGH, SOIL |
|
Denied |
DENIED |