Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Correction Required
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T99CM02795
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Correction Required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/28/1999 | PLUMBING - ROUGH, SOIL | Correction Required | ADDTL COMMS - 1. ALL CORRECTIONS HAVE BEEN MADE 2. OK TO VACKFILL TRENCHES | |
07/26/1999 | PLUMBING - ROUGH, SOIL | Correction Required | ADDTL COMMS - 1. CAN NOT USE NO HUB COUPLINGS ON PLASTIC. COUPLING MUST BE SPECIALTY COUPLINS WHEN YOU CONNECT ABS TO C.I. 2. OUTLET OF GREASE TRAP HAS OBSTRUCTION OF FLOW @ OUTLET OF TRAP. 3. N.H. COUPLINGS @ OUTSIDE OF BLDG, MUST ALSO BE SPECIALTY COUPLINGS 4. MUST PAY REINSPECTION FEE BEFORE NEXT INSPECTION | |
07/26/1999 | PLUMBING - ROUGH, SOIL | Denied | DENIED | |
07/22/1999 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection 0000* | |
07/19/1999 | PLUMBING - ROUGH, SOIL | Correction Required | ADDTL COMMS - 1. CAN NOT USE FERMCO COUPLING UNDER SLAB 2. GREASE TRAP MUST HAVE EVEN FLOW @ OUTLET OF TRAP. GALV BUSHING MUST BE REMOVED DUE TO OBSTRUCTION OF FLOW. 3. GREASE TRAP MUST BE VENTED 4. 2 WASTE LINE MUST GO ALL THE WAY TO BAR SINK W/CO @ CHANGE OF DIRECTION 5. 3 COMPT BAR SINK MUST HAVE DRAINAGE FITTING AND STUDOR VENT W/TRAP AND C.O. 6. CAN NOT USE N.H. COUPLING TO CONNECT 2 WASTE LINE FROM B. SINK MUST BE SPECIALTY COUPLING | |
07/19/1999 | PLUMBING - ROUGH, SOIL | Denied | DENIED |