Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2000 | PLUMBING - INTERMEDIATE | Approved | ||
| 09/14/2000 | PLUMBING - INTERMEDIATE | Partial Approval | NEED TEST ON WELD PIPE | |
| 08/10/2000 | PLUMBING - INTERMEDIATE | Not ready for Inspection | BLDG #1 NOT READY FOR INSPECTION 0 LBS ON GAUGE AT THIS TIME CORRECTIONS HAVE NOT BEEN MADE ON WATER LINE THROU STEEL AND WASTE LINE FOR FLOOR COVERED W/OUT INSPECTION | |
| 07/18/2000 | PLUMBING - INTERMEDIATE | Partial Approval | BLDG #2 PLEASE PROVIDE REVISED PLAN ON PLUMBING |
|
| 07/05/2000 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0000* | |
| 07/03/2000 | PLUMBING - INTERMEDIATE | Denied | 1. GAS PRESSURE TEST MUST HAVE MIN 10 LBS 2. NO APPROVED AND REVISED PLAN FOR GAS LINE AS REQUESTED 3. C.O. FOR SERVICE SINK P-1 MUST BE ON VERTICAL |
|
| 05/23/2000 | PLUMBING - INTERMEDIATE | Correction Required | ADDTL COMMS - 1. PLEASE POST ADDRESS ON BLDG 2. SUPPER ON PLUMER NOT ON JOB 3. NO APPROVED PLANS ON SITE 4. PROVIDE A PRESSURE TEST ON COMPLETE SYSTEM GAS | |
| 05/23/2000 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection 0000* |