Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T99CM02234

Parcel: 133210320

Inspection Status: Correction Required

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
08/12/1999 EXCAVATION/LAYOUT REBAR & ZON Correction Required ADDTL COMMS - PUT THE UFER ON THE BOTTOM BOWL BAR
08/11/1999 EXCAVATION/LAYOUT REBAR & ZON Correction Required ADDTL COMMS - NOT READY - 1. SUPPLY SEPARATION ON STRUCTURAL STEEL TO BARS DRIVEN IN EARTH FOR SUPPORT. 2. LAYOUT WINDOWS AND DOORS. SUPPLY VERTICAL STEEL AT BULK HEADS. 3. TOE DOWN CALLED FOR-TO EXISTING SLAB.
08/11/1999 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection 0000*