Inspection History Details
Inspection Status: Denied
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2000 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0999* 100 AMP PNL FEEDING NEON CIRCUITS AND ICE MACHINES THIS PANEL NEEDS A MAIN BREAKER BACK FEED OK |
|
| 05/16/2000 | ELECTRIC - FINAL | Correction Required | ADDTL COMMS - 1. NEW PANEL AND CIRCUITS IN IT NEED TO BE PERMITTED. INSTALL A GROUND BUSHING ON CONDUIT WHERE ENTERING NEW PNL AND BOND TO ENCLOSURE 2. TAP INTO LOAD SIDE OF EXISTING 200A DISCONNECT WRONG NOT RATED OR APPROVED TO ADD LUGS ON TOP OF EXISITN SPLICE CONDUTORS AND RUN ONE CONDUTOR INTO LOAD LUG. 3. BORDER NEON AND NORTH SIGN NEVER PERMITTED NEED CONTRACTOR TO OBTAIN PERMIT CALL FOR INSPECTION AND MEET INSPECTOR. | |
| 05/16/2000 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0999* | |
| 05/12/2000 | ELECTRIC - FINAL | Correction Required | ADDTL COMMS - NEED PERMIT FOR EXIT LIGHTING AND NEON LIGHTING AND SIGN PERMITS BATTERY BACK UP LIGHTING IS REQUIRED ON EXIT LIGHTS TOO CALL RAY MAJUTA 791-5550 X 136 WIRING TO SIGN COVERED W/OUT INSPECTIONS (CARFLEX ILEGAL WHERE SUBJECT TO PHYSICAL DAMAGE THIS INSPECTION TO BE HANDLED BY RAY MAJUTA CITY ELECTRICAL INSPECTOR II | |
| 05/12/2000 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0999* | |
| 05/10/2000 | ELECTRIC - FINAL | Correction Required | ADDTL COMMS - CALLED NO ANSWER- NO ONE ON SITE | |
| 05/10/2000 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0920$ | |
| 09/22/1999 | ELECTRIC - FINAL | Correction Required | ADDTL COMMS - THIS INSPECTION WAS PERFORMED 9/21/99 1 THERE ARE NO PERMITS FOR NEON OUTSIDE OR INSIDE 2 NO FINAL TO BE ISSUED TILL EXIT SIGNS PERMITED@INSPED 3 WHAT HAS BEEN INSTALLED ACCORDING TO THE PLAN IS OK, UNLESS YOU WILL BE FINISHED WITH ITEMS ABOVE AND OTHER INSPECTIONS REQUIRED YOU WILL HAVE TO POST ABOND FOR TEMP C OF O IN ORDER TO OPEN WED. 4 THE TEMP C OF O IS ALSO SUBJECT TO LETTER FROM TANQUE VERDE ELECT ON TAKING OVER THE JOB UNDER THERE L-11 LIC. 5 THER ARE NO KITCHEN FACILITIES OPERABLE AT THIS TIME, THEY WILL HAVE TO BE PERMITTED WHEN INSTALLED. | |
| 09/22/1999 | ELECTRIC - FINAL | Partial Approval | OK FOR TEMP C/O | |
| 09/22/1999 | ELECTRIC - FINAL | Denied | SEE COMMENTS | |
| 09/22/1999 | ELECTRIC - FINAL | Not ready for Inspection | OK TEMP C OF O BOND-ALL | |
| 09/22/1999 | ELECTRIC - FINAL | Not ready for Inspection | OTHER ITEMS PREVIOUSLY | |
| 09/22/1999 | ELECTRIC - FINAL | Not ready for Inspection | TO BE COMPLETED BEFOR | |
| 09/22/1999 | ELECTRIC - FINAL | Not ready for Inspection | BOND RELEASED |