Inspection History Details
Inspection Status: Correction Required
Inspection History: PLUMBING - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/26/1999 | PLUMBING - ABOVE CEILING | Correction Required | ADDTL COMMS - 1. ALL CORRECTIONS HAVE BEEN |