Permit: T99CM01784

Parcel: 136153850

Inspection Status: Correction Required

Inspection History: FRAMING

Permit Number - T99CM01784

Inspection Description - FRAMING

Inspection Status - Correction Required

Date Description Inspector Results Comments
12/02/1999 FRAMING Correction Required ADDTL COMMS - FINISH NAILING WALL SHEATHING, REPLACE MISSING BLOCKS & COMPLETE BOTTOM PLATE HARDWARE. BLOCK THE CORNER NEAR THE NORTHWEST CORNER OF BLDG & PROVIDE S/R NAILERS. TIGHTEN NUTS ON BEAM SEAT (BOLTS). COMPLETE HE-15S. PROVIDE MACHINE BOLTS @BEAM SEAT AT N.E. CORNER. HAVE PROJECT ENGINEER APPROVE OSB IN LIEU OF CDX/ CONFIRM EDGE DISTANCE TO PERIMETER NAILS IN SHTG IS NOT LESS THAN 3/8.