Inspection Status: Correction Required
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/30/1999 |
BUILDING - FINAL |
|
Correction Required |
ADDTL COMMS - THE INFORMATION I NEED IS FOR THE DISCONNECT IN THE GARAGE BETWEEN THE HOT WATER TANK AND THE FURNACE IT HAS 45 AMP FUSE IN IT AND I CAN NOT DETERMINE THE RIGHT FUSES WITH THE LABEL ON THE HEATER. THE FUSES AT THE A/C COMPRESSOR ARE CORRECT AT 35 AMP BUT THIS IS NOT WHAT I WAS ASKING FOR. SEE NOTE 6/29/99. |
| 06/30/1999 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999* |
| 06/29/1999 |
BUILDING - FINAL |
|
Correction Required |
ADDTL COMMS - PROVIDE INFORMATION TO DETERMINE PROPER FUSE SIZE FOR A/COIL HEATER DISCONNECT IN GARAGE. 1. PROVIDE POSITIVE ANCHOR FOR FLEX CONDUIT ENTERING WALL FOR HUT WATER HEATER. 3. PULL STOVE FROM WALL. |
| 06/29/1999 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999* |