Inspection History Details
Inspection Status: Correction Required
Inspection History: ELECTRIC - CABLE DROP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/27/1999 | ELECTRIC - CABLE DROP | Correction Required | ADDTL COMMS - POST TENSION 20 DAYS 1. COLUMN STRAPS. 2. NAIL REAR SHEAR HORIZ |