Inspection Status: Correction Required
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 04/21/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - POST TENSION OVER DUE |
| 04/19/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - FINISH SHEAR AND H.DS |
| 04/19/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 04/15/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - POST TENSION OVER DUE 1)DBL STUD UNDER CONTROL TRUSSES 2)MISSING HD & POP OUT AT FRONT BEDROOM 3)NEED SOME BLOCKS AT ROOF DECK MARKED IN PAINT 4) CHECK FOR TOP PLANGE NAILS (?) |
| 04/15/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Not ready for Inspection |
IVRS - Inspection 0000* |