Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 02/04/1999 |
PLUMBING - ROUGH, SOIL |
|
Correction Required |
ADDTL COMMS - PLEASE PROVIDE A REVISED PLAN, WITH ALL REQUIRED APPROVALS, FOR THE SUBSTITUTION OF TJI (LUL) TRUSSES FOR THE 2X12 JOIST RAFTERS WHICH ARE REQUIRED BY THE DESIGNING ARCHTITECT/ENGINEER. THE PLANS YOU CURRENTLY HAVE BEAR THE SEALS OF BOTH JAMES S. TRIBOLET (STRUCTRAL ENGINEER) AND JON T. ANDERSON (REGISTERED ARCHTECT). THE NEW FRAMING PLAN MUST BE APPROVED BY THE ENGINEER-OF-RECORD OR THE ARCHITECT OF THE RECORD AS THE DESIGN IS PROPRIETARY TO ONE OR THE OTHER. FAILURE TO PROVIDE THE APPROVED REVISED PLAN AT ROOF NAILING OR INTERMEDIATE INSPECTIONS WILL RESULT IN THE INSPECTION BEING DENIED. YOUR COOPERATION IS REQUESTED. |