Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Correction Required
Inspection History: MECHANICAL - FINAL
Permit Number - T99CM00180
Inspection Description - MECHANICAL - FINAL
Inspection Status - Correction Required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/30/2000 | MECHANICAL - FINAL | Correction Required | ADDTL COMMS - NOTE! MECHANICAL FINAL CONTINGENT ON ELECTRICAL FINAL APPROVAL | |
| 03/23/2000 | MECHANICAL - FINAL | Correction Required | ADDTL COMMS - 1. PAINTED PVC IS OK 2. ADDITIONAL HANGERS ARE OK 3. EXISTING BOILER CANNOT BE IN THE SAME ROOM AS THE CONDENSORS. | |
| 03/23/2000 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection 0000* | |
| 03/22/2000 | MECHANICAL - FINAL | Correction Required | ADDTL COMMS - 1. CHILLER INSTALLED IN WITH A HOT WATER HEATING BOILER WITH NO SEPERATION. | |
| 03/22/2000 | MECHANICAL - FINAL | Denied | DENIED | |
| 02/17/2000 | MECHANICAL - FINAL | Correction Required | ADDTL COMMS - 1. NEED ADDITIONAL HANGARS, CHANGE OF DIRECTION, TOWER COND WATER, DOWN INTO CONDENSERS 2. PVC LOCATED AT TOWER NEEDS TO BE PAINTED W/SYNTHETIC LATEX PAINT 3. BE SURE TO CALL PRIOR TO FINAL INSPECTION TIME | |
| 02/17/2000 | MECHANICAL - FINAL | Partial Approval | PARTIAL APPROVAL |