Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/04/2003 | ENGINEERING - FINAL | Approved | ||
| 03/28/2003 | ENGINEERING - FINAL | Denied | PROVIDE A-BUILT SITE PLAN DRAWINGS AND REVISED DRAINAGE REPORT FOR APPROVAL BY CITY OF TUCSON ENGINEERING SECTION. |