Inspection Status: Correction Required
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date |
Description |
Inspector |
Results |
Comments |
| 01/11/2000 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
ADDTL COMMS - THE NEXT INSPECTION IS THE ROOF NAILING INSPECTION. IF THIS IS AN ALL METAL CARPORT, THE ROOF NAILING, FRAMING, AND BUILDING FINAL CAN ALL BE DONE AT THE SAME TIME. THERE ARE NO FRAMING PLANS AVAILABLE ON THE JOB. IF THIS IS A WOODEN CARPORT, THE ROOF NAILING AND FRAMING INSPECTIONS CAN BE DONE AT THE NEXT INSPECTION. THEN AFTER IT IS COMPLETED, THE BUILDING FINAL CAN BE MADE. ALSO, IF THIS IS A WOODEN CARPORT, KEEP ALL COMBUSTIBLES, WOOD AND ROOFING, AT LEAST 2 AWAY FROM THE FIREPLACE/CHIMNEY. |
| 11/26/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 11/19/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
ADDTL COMMS - PLANS REQ 20 X 4.50 DEPTH, FOOTINGS ARE ALREADY POURED AND HAVE A 18 DEPTH REVEALED AT ONE FOOTING. PLEASE HAVE GLENN CONSTULTANTS COMMENT ON 18 DEPTH |
| 11/19/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Not ready for Inspection |
NOT READY FOR INSPECTION |
| 11/14/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
IVRS - Inspection 0999* |
| 11/12/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
ADDTL COMMS - DIG ALONG SIDE ONE OF THE POLES SO I CAN SEE HOW DEEP FOOTINGS ARE, ALSO HIGHLIGHT ON MANUFACTURERS SPEC. DIMENSIONS OF FOOTING. CALL AGAIN. |
| 11/12/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Not ready for Inspection |
NOT READY FOR INSPECTION |