Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/25/2006 | GRADING - FINAL | Approved | Project close out, ok to release bond | |
| 02/12/2002 | GRADING - FINAL | Denied | COMPLETE THE FOLLOWING ITEMS AS SHOWN ON THE APPROVED PAVING & GRADING PLANS: 1) DUMPSTER LOCATION HAS CHANGED (ZONING APPROVAL IS REQUIRED.) 2) SOUTHERN BASIN: SOUTH SLOPES OF DRAINAGEWAY SHOULDHAVE BEEN CONSTRUCTED WITH CONCRETE. NORTH SLOPES WERE TO BE LINED WITH HAND PLACED ROCK RIP-RAP. BASIN SIZE HAS BEEN REDUCED; THIS AREA NEEDS TO MATCH THE PLAN DIMENSIONS. ADDITIONAL AREAS OF GROUTED ROCK RIP-RAP IS REQUIRED. THESE SPECIFIC AREAS ARE SHOWN ON THE APPROVED PLANS. 3) NORTHERN BASINS-BASINS HAVE BEEN REDUCED IN SIZE; PROVIDE DOCUMENTATION SHOWING THEIR DIMENSIONS AND ESTIMATED QUANTITIES. DRAINAGE OPENINGS HAVE BEEN INSTALLED THROUGH THE 30" CMU MASONRY SCREEN WALL; THESE NEED TO BE REMOVED. 4) SOUTHERN P.A.A.L. HAS BEEN REDUCED FROM 24'- TO 19; PARKING SPACES ON SITE HAVE BEEN REDUCED BELOW THE APPROVED AMOUNT. THESE ISSUES NEED TO BE APPROVED BY ZONING/PLANNING. |