Permit: T99BU01951


Addresses:

5301 S HOUGHTON RD


Inspection Status: Approved

Inspection History: GRADING - FINAL

Permit Number - T99BU01951

Inspection Description - GRADING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
12/18/2009 GRADING - FINAL Approved THE SITE WAS CHECKED AND THE FOLLOWING HOMES HAVE BEEN FOUND TO EITHER NOT BE CONSTRUCTED OR ARE BEING CONSTRUCTED AT THIS TIME.
PHASE 1:
LOT #154 10547 E. CERULEAN WAY UNDER CONSTRUCTION
LOT #36 5262 S CIVANO BLVD. UNDEVELOPED
LOT #93 5325 S CIVANO BLVD. UNDEVELOPED
LOT#97 10532 E SEVEN GENERATIONS WAY UNDEVELOPED
LOT#98 10538 E SEVEN GENERATIONS WAY UNDEVELOPED
LOT#99 10544 E SEVEN GENERATIONS WAY PERMIT PENDING
LOT#121 10501 E ELEANOR MALDONADO UNDEVELOPED
PHASE 2:
LOT#305 5372 S THUNDERSKY WAY UNDEVELOPED
LOT#410 10603 E. KAY GARTRELL PLACE

THE ASSURABLE ITEMS FOR THESE LOTS WILL BE HELD TO THE DEVELOPMENT OF THE LOT, AND THE FINAL CERTIFICATE OF OCCUPANCY WILL NOT BE GRANTED UNTIL ALL AITEMS HAVE BEEN APPROVED BY THE ENGINEERING SECTION.
06/16/2009 GRADING - FINAL Partial Approval THE SITE WAS CHECKED AND THE FOLLOWING LOTS IN PHASE 1 STILL HAVE NOT BEEN CONSTRUCTED UPON. TO FINAL OUT THIS PERMIT AND THIS SUBDIVISION A COMPLETION BOND FOR THE ABOVE NOTED LOTS WILL BE NEEDED FOR ALL REMAINING ASSUR ABLE ITEMS.
09/11/2007 GRADING - FINAL Partial Approval I MET WITH LAITH ALSHAMI, HE WANTS LIST OF LOTS THAT HAVE NOT BEEN BUILT OUT.
I MET WITH RICK ASHLEY
PHASE I
UN-BUILT LOTS 36,93,97,98,98,99,121,154
UNDER CONSTRUCTION LOT 128

PHASE II
UNBUILT LOTS 305 AND 410
UNDER CONSTRUCTION LOTS 409 AND 526
09/10/2007 GRADING - FINAL Partial Approval I SPOKE TO RICK ASHLEY 975-7757
PHASE I HAS (8) UN-BUILT LOTS.
PHASE II HAS (3) UN-BUILT LOTS.
A REVISED GRADING PLAN FOR DRAINAGE CHANNEL REPAIR AND MODIFICATIONS ARE IN PROGRESS.
03/01/2007 GRADING - FINAL Partial Approval AREA HAS BEEN CHECKED FOR TO VERIFY THAT A GRADING RESEEDING BOND REDUCTIO0N OF 90% IS ACCEPTABLE. AFTER COMPARING THE WORK THAT IS REMAINING A REDUCTION OF THIS AMOUNT IS FOUND TO BE ACCEPTABLE.
05/24/2005 GRADING - FINAL Partial Approval
09/20/2004 GRADING - FINAL Partial Approval INSPECTION FOR PERMIT EXTENSION ONLY
08/09/2004 GRADING - FINAL Partial Approval NO STORMWATER CONCERNS.
03/24/2004 GRADING - FINAL Partial Approval SEE PREVIOUS COMMENTS
09/29/2003 GRADING - FINAL Partial Approval
09/26/2003 GRADING - FINAL Partial Approval
09/24/2003 GRADING - FINAL Partial Approval
04/03/2003 GRADING - FINAL Denied THIS SITE HAS BEEN DENIED IN THE PAST FOR SOME CHANGES THAT HAVE BEEN MADE TO THE DRAINAGE CHANNELS. UNTIL THESE CHANGES ARE SUBMITTED TO AND APPROVED BY THE ENGINEERING DEPARTMENT THIS INSPECTION WILL NOT BE CHANGED TO AN APPROVED STATUS. IF YOU WILL CONTACT DAVID ROBERTS AT 349-5845 HE WILL PROVIDE YOU WITH A COPY OF THE PREVIOUS PUNCHLIST THAT WAS GENERATED ON DEC.7, 2001.
10/09/2002 GRADING - FINAL Partial Approval AS NOTED ON PREVIOUS INSPECTION SEE NOTES ON THE FLOODPLAIN INSPECTION REPORT DATED 12/07/01 FOR COMMENTS. ALL DRAINAGE ISSUES NEED TO BE RESOLVED BEFORE THIS SITE CAN BE RELEASED
04/30/2002 GRADING - FINAL Partial Approval SEE PREVIOUS FLOODPLAIN INSPECTION REPORT DATED 12/7/01 FOR COMMENTS
11/28/2001 GRADING - FINAL Partial Approval IVRS - Inspection 0000*
06/21/2001 GRADING - FINAL Partial Approval IVRS - Inspection 0000*(LOTS 482/485 CULVERTS.
06/14/2001 GRADING - FINAL Partial Approval IVRS - Inspection 0000*BOX DRIVEWAY CULVERTS AT LOTS 482 AND 485, FLOOR AND STEMS APPROVED.
04/10/2001 GRADING - FINAL Partial Approval IVRS - Inspection 0000*
10/17/2000 GRADING - FINAL Partial Approval IVRS - Inspection 0000*
05/19/2000 GRADING - FINAL Partial Approval IVRS - Inspection 0000*
05/18/2000 GRADING - FINAL Partial Approval IVRS - Inspection 0000*