Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T99BU01865

Parcel: 133530750

Inspection Status: Correction Required

Inspection History: BUILDING - FINAL

Permit Number - T99BU01865

Inspection Description - BUILDING - FINAL

Inspection Status - Correction Required

Date Description Inspector Results Comments
10/12/1999 BUILDING - FINAL Correction Required ADDTL COMMS - NAIL FASCIA TO EVERY RAFTER, COVER PLYWOOD EDGES WITH METAL TRIM, PROVIDE JOIST HANGERS (4) AT SKYLIGHT HEADERS, NAIL THE TWO 2 X 8S AT THE HIP WITH 16D NAILS STAGGERED AT 16 C.C., NAIL THE SLANTED JOIST HANGERS AT THE HIP. CHECK ALL OF THE HARDWARE AND FILL ALL OF THE NAIL HOLES.
10/12/1999 BUILDING - FINAL Not ready for Inspection NOT READY FOR INSPECTION
09/20/1999 BUILDING - FINAL Correction Required ADDTL COMMS - ALL RAFTERS MUST BE CLIPPED WITH H 2.5. HEADERS NEED HANGERS. NAILS MISSING AT H 2.5.
09/20/1999 BUILDING - FINAL Denied IVRS - Inspection 0999*