Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: BUILDING PRE-SLAB
| Date |
Description |
Inspector |
Results |
Comments |
| 08/05/1999 |
BUILDING PRE-SLAB |
|
Correction Required |
ADDTL COMMS - NO EVIDENCE OF UFER NO EVIDENCE OF UFER GROUND IN FOOTINGS. YOU WILL BE REQUIRED TO INSTALL GROUND RODS FOR THE GROUNDING SYSTEM |
| 08/03/1999 |
BUILDING PRE-SLAB |
|
Correction Required |
ADDTL COMMS - 1. DETAIL B-2 NOT COMPLETE AT BACK PATIO. 3. ALL PLASTIC PIPE NEEDS TO BE PROTECTED FROM CONCRETE (WRAP). 4. NO INSPECTION ON ELECTRICAL UFER? |
| 08/03/1999 |
BUILDING PRE-SLAB |
|
Denied |
DENIED |