Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/19/2000 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection 0000* | |
| 09/18/2000 | PLUMBING - INTERMEDIATE | Not ready for Inspection | NOT READY PLEASE PROVIDE PROPER APPROVEL TRANSSION AND FULL SIZE CO END OF RUN DON'T FORGET CO END OF RUN NOT INSTALLED AT THIS TIME |
|
| 04/03/2000 | PLUMBING - INTERMEDIATE | Correction Required | ADDTL COMMS - 1. JOB NOT INSTALLED AS PER PLAN 2. NEED PLUMBING CONTRACTOR TO INSTALL AS PER APPROVED PLAN. OR PROVIDE REVISED APPROVED PLANS. ALSO NEED PLAN FOR NEW GAS PIPING AND INSTALLATION OF WATER HEATER. ALL TEST WILL BE REQUIRED-42 WASTE AND VENTS WATER AND GAS TEST ALSO NEED PERMIT FOR FURNACE AND GAS PIPING WATER HEATER. | |
| 04/03/2000 | PLUMBING - INTERMEDIATE | Not ready for Inspection | NOT READY FOR INSPECTION | |
| 01/31/2000 | PLUMBING - INTERMEDIATE | Correction Required | ADDTL COMMS - LOCKED CALL BACK | |
| 01/31/2000 | PLUMBING - INTERMEDIATE | Denied | DENIED |