Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/13/1999 |
PLUMBING - ROUGH, SOIL |
|
Correction Required |
ADDTL COMMS - 1. 3 TWO WAY NOT ACCEPTABLE FOR CLEAN OUT. THIS IS NOT APPROVED PER MANUFACTURE. OPTIONS: 4 ABS FROM HCS OR BULL HORD CLEAN OUTS WITH 3 ABS COMBOS (NOTE: FINISH GRADE TO BOTTOM OF PIPE EQUALS 36+) NOTE PER HENRY DURAZO- OKAY TO USE 3 - WAY ABS CLEAN OUT IF NO DEEPER THAN 24 FROM GRADE TO BOTTOM OF SEWER LINE. OR OBTAIN MANUFACTURE APPROVAL FOR 3-2 WAY. 2. OKAY TO BACK FILL TO PRE SLAB, LEAVE CLEAN OUT OPEN TILL RESOLVED OKAY TO BACK FILL PLUMBING YARD WATER. |