Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 01/06/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - 1. HOUSE DOES NOT MATCH TRUSS PLAN AT MID BEARING POINT. |
| 12/31/1998 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - 1. CLIP FRONT GABLE TO WALL AT 32 O.C. 2. OVER SPAN ON FRONT SHEAR STUD MISSING. 3. CLIP GARAGE HEADER TO KING STUDS. 4. OVER SPAN GARAGE WALL BEARIGN STUDS MUST BE SPACED NOT MORE THAN 16 O.C. 2 PLACES. 5. PROVIDE FOR DRYWALL SHEAR TRANSFER AT INTERSECTING WALL CHANELS. 6. SHIM 3 POINT TRUSS AT BEARING POINT. 7. TRUSS PLAN AND BRACES NOT IN. |
| 12/31/1998 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0999* |