10/21/1998 EXCAVATION/LAYOUT REBAR & ZON Correction Required ADDTL COMMS - THE SET OF PLANS PROVIDED FOR INSPECTION IS INCOMPLETE. THE FOUNDATION PLAN SHEETS DO NOT BEAR AN APPROVED AGENCY SEAL. IT IS ASSUMED THAT ALL SLABS POURED TO DATE ARE UNACCEPTABLE BECAUSE THE GARAGE FOOTING WERE NOT EXCAVATED PER PLAN. NO FOUNDATION INSPECTION WILL RECEIVE APPROVAL UNTIL AN APPROVED SET OF PLANS IS FURNISHED AS REQUESTED. ALSO A REMEDY FOR RETRO REPAIR OF THE PREVIOUSLY POURED SLABS MUST BE SUBMITTED TO THE DEVELOPMENT SERVICES CENTER.
10/21/1998 EXCAVATION/LAYOUT REBAR & ZON Denied DENIED
10/20/1998 EXCAVATION/LAYOUT REBAR & ZON Correction Required ADDTL COMMS - THE INSPECTION SET OF PRINTS IS INCOMPLETE AND DOES NOT BEAR THE REQUIRED SEALS. PROVIDE THE PROPER SET.
10/20/1998 EXCAVATION/LAYOUT REBAR & ZON Denied DENIED