Inspection Status: Correction Required
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 12/04/1998 |
FRAMING |
|
Correction Required |
ADDTL COMMS - THE SHUTOFF VALVES IN THE BATHROOM WILL HAVE TO BE ACCESSIBLE-ADD AN ACCESS PANEL, THE STUDOR VENT WILL REQUIRE A PERMANENT GRILLE IN THE FACE OF THE WALL TO ALLOW FRESH AIR INTO THE WALL CAVITY & THE STUDOR VENT, THE 2 X 6 BLOCK AROUND THE WALL HEATER GAS VENT WILL HAVE TO BE NOTCHED TO ALLOW 1 CLEARANCE TO THE METAL OF THE VENT, THE KITCHEN SINK DRAIN/VENT PIPE REQUIRES AN ACCESSIBLE WALL CLEANOUT, STRAP THE PIPE PROPERLY TO OUTSIDE WALL & PAINT WITH LATEX PAINT (ABS PIPE), COMPLETE THE WORK WITH ELEC, COOLING AND ANY OTHER WORK AND CALL FOR ALL INTERMEDIATE INSPECTIONS. |
| 12/04/1998 |
FRAMING |
|
Denied |
DENIED |
| 10/01/1998 |
FRAMING |
|
Correction Required |
ADDTL COMMS - 1. REMOVE ALL DRYWALL. 2. UNCOVER SEWER. 3. WILL NEED TO DETERMINE OUT COME OF SOIL LINES. 4. WORK NOT DONE IN A WORKMANSHIP MANNER ALL H2O LINES ELECT AND DUCT WORK. 5. ALL BOTTOM PLATES TO BE TREATED. 6. WILL HAVE A DECISION FROM SUPERVISOR ON SLAB AND PLUMBING. |
| 10/01/1998 |
FRAMING |
|
Not ready for Inspection |
NOT READY FOR INSPECTION |