Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: STUCCO MESH
| Date |
Description |
Inspector |
Results |
Comments |
| 11/06/1998 |
STUCCO MESH |
|
Correction Required |
ADDTL COMMS - 1. DRY WALL SHEAR WALL 3 OVER SPANED BY LAUNDRY MUST BE NAILED TO STUDS SPACED A MAXIMUM OF 16 O.C IF STUDS ARE NOT IN PLACE REMOVE DRYWALL AND RE FRAME DO NOT COVER. 2. SHEAR WALL 2 MUST BE NAILED AT 4 O.C UNBLOCKED OR 7 O.C BLOCKED. 3. WINDOWS NOT IN OR STUCCO NOT COMPLETE AT WINDOWS. |
| 11/06/1998 |
STUCCO MESH |
|
Denied |
IVRS - Inspection 0150* |