Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 12/01/1998 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - APPROVED AS NOTED. 1. NEED H.D SOUTH SIDE OF REAR SLIDING GLASS DOOR REAR SLIDING GLASS DOOR REQUIRED - SEE PLANS. 2. H.D. REQUIRED ON SOUTH SIDE OF STUDS (WEST WINDOW) . 3. HAVE DETAIL 10/S-3.1 REVISED TO SHOW AS BUILT . SEE #10 PREVIOUS INSPECTION ON 11-10-98. WILL CHECK ABOVE AT FINAL FRAME. |
| 11/12/1998 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0999* |
| 11/10/1998 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - 1. RECHECK AND NAIL ROOF SHEATHING ABOVE BEDROOM #2 AND AT NAILER ON SOUTH SIDE ABOVE WINDOW. 2. NAIL OFF SHEATHING AT REAR PORCH NEAR TOP AT NORTH EAST HIP EITHER COMMON RAFTER OR JACK. 3. COULD NOT INSPECT ROOF AREA OVER LIVING COVERED WITH EXTRA OSB CLEAN OFF. 4. RECHECK ALL SHEAR PANELS ON EXTERIOR WALLS FOR NAILING. 5. NAIL ALL PAHD STRAP TO DOUBLE FULL HEIGHT STUDS. 6. 1-PAHD OR HD2A MISSING BETWEEN REAR SLIDING GLASS DOOR AND WINDOW. 7. CHECK PAHDS AT FRONT STUDY FOR PROPER CONNECTION TO DOUBLE FULL LENGHT STUDS. 8. USE APPROVED TYPE HANGERS AT CENTER OF HIP TRUSSES AT ENTRY AND STRAP HEADER BEAMS TO COLUMN. 9. SEE DETAIL 9/53.1 FOR PROPER LEDGER CONNECTION RE H2.5 AND L90 CLIPS. 10. SEE DETIAL 10/53.1 CALLS FOR 2X10 NAILER 2X4 USED. REVISE PLANS OR COMPLY. |
| 11/10/1998 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
DENIED |