Inspection Status: Partial Approval
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/27/2000 |
BUILDING - FINAL |
|
Partial Approval |
IVRS - Inspection 0000* |
| 11/29/1999 |
BUILDING - FINAL |
|
Correction Required |
ADDTL COMMS - 1. BLOCK AND STRAP 3/6 WATER LINES. 2. INSTALL TEMP, PRESS, RELIEF LINE. |
| 11/29/1999 |
BUILDING - FINAL |
|
Not ready for Inspection |
NOT READY FOR INSPECTION |
| 07/01/1999 |
BUILDING - FINAL |
|
Correction Required |
ADDTL COMMS - 1. H20 HEATER NEED FLEX CONNECTORS AT H20 HEATER REMOVE UNIONS. 2. NEED TEMP. PRESS RELIEF LINE (CHECK RELIEF VALVE). 3. ADD 2X6 TO 4X8 BEAM & BOLT 30 O.C., PLAN CALLS FOR 6X8, 4X8 INSTALLED. 4. NEED WORK ON SERV EQUIP. 5. G.F.CI OUTLET IN BATH WONT TRIP WHEN SHORTED OUT. 6. 2ND OUTLET IN BATHROOM SHOWS NO CAP . USE GFCI RECEPTECLE. |
| 07/01/1999 |
BUILDING - FINAL |
|
Not ready for Inspection |
NOT READY FOR INSPECTION |