Inspection History Details
Inspection Status: Correction Required
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T98CM03330
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Correction Required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/26/1999 | EXCAVATION/LAYOUT REBAR & ZON | Correction Required | ADDTL COMMS - SECOND STORY FLOOR, OVER GARAGE | |
06/15/1999 | EXCAVATION/LAYOUT REBAR & ZON | Correction Required | ADDTL COMMS - 1. 3 HOLD DOWNS MISSING, PROVIDE ENGINEERING FOR REPLCEMENT. 2. 7-PAHD 42 MISSING MINIMUM 30 #4 REBAR AT SHOE. | |
06/15/1999 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection 0999* | |
06/11/1999 | EXCAVATION/LAYOUT REBAR & ZON | Correction Required | ADDTL COMMS - 1. #4 REINFORCEMENT MISSING AT WEST BAY WINDOW DETAIL #2/S2. 2. #4 REBAR FROM RETAINING WALL BENT INTO SLAB MISSING AT WEST 12 CMU WALL DETAIL #9 SEE HIGHLIGHT FOUNDATION PLAN. 3. 40 HOLD DOWNS NOT PLACED. (SEE HIGHLIGHT FOUNDATION PLAN). SEE SHEET A-4 FOR TYPE AND LOCATION VARIFICATION. NOTE: THERE ARE 16 ADDTIONAL WHEN GARAGE IS POURED SEE A/4. 4. BAR NOT PLACED AT OPENING SEE 6/S2. 5. MAINTAIN 3 CLEARANCE UNDER ALL REBAR. 6. PLUMBING NOT WRAPPED COMPLETELY. ** STOPPED INSPECTION ** STOPPED INSPECTION** | |
06/11/1999 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection 0999* | |
05/28/1999 | EXCAVATION/LAYOUT REBAR & ZON | Correction Required | ADDTL COMMS - PARTICLE IS FOR PATIO WALL FOOTING. FOOTING HAS 2- #4S HORIZONTAL AND #4S VERTS AT 4-0 O.C. PATIO WALL DOES NOT MATCH THE APPROVED SITE PLAN, AT SOUTH END, SEE HIGH LIGHTING ON SITE PLAN. FOOTING NOT DESIGNED TO RETAIN EARTH. | |
05/28/1999 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
05/25/1999 | EXCAVATION/LAYOUT REBAR & ZON | Correction Required | ADDTL COMMS - 1. NOT READY FOR INSPECTION. | |
05/25/1999 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection 0999* | |
05/07/1999 | EXCAVATION/LAYOUT REBAR & ZON | Correction Required | ADDTL COMMS - STEEL NOT COMPLETE | |
05/07/1999 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | NOT READY FOR INSPECTION | |
03/29/1999 | EXCAVATION/LAYOUT REBAR & ZON | Correction Required | ADDTL COMMS - THIS INSPECTION IS FOR FRONT PORCH SLAB EXITING SECOND STORY OVER GARAGE. BACK PATIO SLAB AND POST FOOTINGS ALSO APPROVED | |
03/29/1999 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
03/25/1999 | EXCAVATION/LAYOUT REBAR & ZON | Correction Required | ADDTL COMMS - BUILDING ENVELOPE LINES UNCLEAR-POUR AT OWN RISK | |
03/25/1999 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* |