Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date |
Description |
Inspector |
Results |
Comments |
| 07/26/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
ADDTL COMMS - SECOND STORY FLOOR, OVER GARAGE |
| 06/15/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
ADDTL COMMS - 1. 3 HOLD DOWNS MISSING, PROVIDE ENGINEERING FOR REPLCEMENT. 2. 7-PAHD 42 MISSING MINIMUM 30 #4 REBAR AT SHOE. |
| 06/15/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
IVRS - Inspection 0999* |
| 06/11/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
ADDTL COMMS - 1. #4 REINFORCEMENT MISSING AT WEST BAY WINDOW DETAIL #2/S2. 2. #4 REBAR FROM RETAINING WALL BENT INTO SLAB MISSING AT WEST 12 CMU WALL DETAIL #9 SEE HIGHLIGHT FOUNDATION PLAN. 3. 40 HOLD DOWNS NOT PLACED. (SEE HIGHLIGHT FOUNDATION PLAN). SEE SHEET A-4 FOR TYPE AND LOCATION VARIFICATION. NOTE: THERE ARE 16 ADDTIONAL WHEN GARAGE IS POURED SEE A/4. 4. BAR NOT PLACED AT OPENING SEE 6/S2. 5. MAINTAIN 3 CLEARANCE UNDER ALL REBAR. 6. PLUMBING NOT WRAPPED COMPLETELY. ** STOPPED INSPECTION ** STOPPED INSPECTION** |
| 06/11/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
IVRS - Inspection 0999* |
| 05/28/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
ADDTL COMMS - PARTICLE IS FOR PATIO WALL FOOTING. FOOTING HAS 2- #4S HORIZONTAL AND #4S VERTS AT 4-0 O.C. PATIO WALL DOES NOT MATCH THE APPROVED SITE PLAN, AT SOUTH END, SEE HIGH LIGHTING ON SITE PLAN. FOOTING NOT DESIGNED TO RETAIN EARTH. |
| 05/28/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
IVRS - Inspection 0000* |
| 05/25/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
ADDTL COMMS - 1. NOT READY FOR INSPECTION. |
| 05/25/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
IVRS - Inspection 0999* |
| 05/07/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
ADDTL COMMS - STEEL NOT COMPLETE |
| 05/07/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Not ready for Inspection |
NOT READY FOR INSPECTION |
| 03/29/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
ADDTL COMMS - THIS INSPECTION IS FOR FRONT PORCH SLAB EXITING SECOND STORY OVER GARAGE. BACK PATIO SLAB AND POST FOOTINGS ALSO APPROVED |
| 03/29/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
IVRS - Inspection 0000* |
| 03/25/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
ADDTL COMMS - BUILDING ENVELOPE LINES UNCLEAR-POUR AT OWN RISK |
| 03/25/1999 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
IVRS - Inspection 0000* |