Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T98CM03109

Parcel: 126211120

Inspection Status: Correction Required

Inspection History: BUILDING - FINAL

Permit Number - T98CM03109

Inspection Description - BUILDING - FINAL

Inspection Status - Correction Required

Date Description Inspector Results Comments
03/03/2000 BUILDING - FINAL Correction Required ADDTL COMMS - DENIED - 1. PROVIDE LETTER FROM LICENSED PLUMBING INSTALLER THAT ALL ROUGH AND INTERMEDIATE PLUMBING WAS ACCOMPLISHED PER CODE AND THAT THEY ARE RESPONSIBLE FOR THE WORK. CITY OF TUCSON IS NOT TO BE HELD RESPONSIBLE FOR WORK NOT INSPECTED. THE LETTER MUST BE PLACED ON FILE WITH DEVELOPMENT SERVICES AND A COPY RETURNED FOR INSPECTORS VARIFICATION. THE LETTER MUST HAVE PLAN CHECK STAMP. 2. A/C DISCONNECT IS NOT PROPERLY MOUNTED. SECURE FROM ROTATION. 3. A/C WEATHER TIGHT CONNECTORS ARE LOOSE. 4. PAINT A.B.S. PLUMBING ON ROOF WITH LATEX PAINT.
03/03/2000 BUILDING - FINAL Denied IVRS - Inspection 0999*