Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Correction Required
Inspection History: FRAMING
Permit Number - T98CM03109
Inspection Description - FRAMING
Inspection Status - Correction Required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/14/1998 | FRAMING | Correction Required | ADDTL COMMS - 1. INSULATE THE COPPER PIPE AT ALL LOCATIONS WHERE IT MIGHT COME IN CONTACT WITH GALVANIZED STEEL FRAMING. PLASTIC BUSHING POORLY INSTALLED AT BATH SINK ( TOP PLATE). ON IS MELTED. 2. I AM CONCERNED THAT THE 2X6 RAFTERS WILL BE OVERLOADED WHEN A/C HEATING UNIT IS MTD ON ROOF. DOUBLE UP ON RAFTERS OR PROVIDE ENGINEERS DATA APPROVEING EXISTING ARRANGEMENT. 3. PROVIDE RECORDED INDEMNIFICATION FOR PLUMBING AND SLAB ON CLOSER EXAM IT APPEARS NO FOOTINGS WERE ADDED FOR THE 6 OF NEW SLAB. | |
09/14/1998 | FRAMING | Denied | DENIED |